- Location:
- Coventry
- Services:
- Budget:
- £2m
- Client:
- Galliford Try
- Sector:
- Education
The new two storey building will replace two outdated existing buildings that are earmarked for demolition. It will be located on the same site and temporary accommodation will ensure continuity of facilities for the school during the build process. The Locally Listed Moat Building will be retained and refurbished too.
The design had to navigate a number of complexities. Located on a tight site, on a flood plain and in a conservation area. Flood data from the LLFA was updated and revised during the design process which led to significant changes in external levels across the site. Our team effectively addressed the challenges and were able to integrate a far superior external space, with a level hard play area for the pupils to enjoy.

With sustainable features, including a green roof, the new building will help to tackle climate change through minimising energy demand and using low carbon and renewable energy solutions. Solar panels are also proposed on the roof. The project has a goal of achieving Net Zero Carbon in Operation and the green roof will contribute to achieving biodiversity net gain.