- Location:
- Derbyshire
- Services:
- Budget:
- £15m
- Client:
- Kier
- Sector:
- Education
A challenging construction site which is shared with the local junior and infant school with a challenging programme to deliver for the start of the 2018/19 school year.
The building has been carefully positioned to enable minor disruption to the existing building but also to offer the correct long-term campus solution for future generations.
.